CLIENT | Sylvia Senter, Cos Cob, NY |
---|---|
PROJECT HIGHLIGHTS | 23 lot residential subdivison on 133 acres including an EIS impact report. Project included the design to remove 4,000 cyds of muck and sediment from a one acre eutrophic freshwater pond to improve water quality to the Mianus River including the replacement design for 200 linear feet of a masonary dam |
CONSTRUCTION COST | $5.5 million (infrastructure) |